AI for heavy equipment fleets

Every crane, every generator. Hours run. Service timed.

Harvinfra tracks running hours across your entire equipment fleet, predicts maintenance before a breakdown happens on site, and reallocates idle units to where the work actually is.

Running hours
Auto logged
Service timing
Predicted
Idle units
Reallocated
Fleet ops board
Live utilization
Streaming
CRANE #04
62%
310h
this month
GENERATOR #02
78%
390h
this month
EXCAVATOR #11
44%
176h
this month
Fleet health
86/ 100
Healthy
18
Watch
04
Due
02
Signal now
GN-02 at 488h. Reroute to Sector 1 after service.
3.2 idle hours saved
Service due
Priority
Generator #02 - 488h of 500h
12h
34m
service
window
Unit spotlight
CR-04
Crane #04
Sector 3 - Bridge deck
Healthy
Hours this month
342/ 500h
68%
Reallocation belt
Today - 04 moves
Generator #02Sector 4Sector 1idle 14hLoader #07Sector 3Sector 2aggregate shortExcavator #11Sector 1Sector 3foundation doneCompactor #03Sector 2Sector 4sub base readyGenerator #02Sector 4Sector 1idle 14hLoader #07Sector 3Sector 2aggregate shortExcavator #11Sector 1Sector 3foundation doneCompactor #03Sector 2Sector 4sub base ready
The board

A row of equipment. A column of truth.

Every unit shows its running hours, its service window, and where it currently sits. Numbers tick as work happens. When a unit reaches its interval, a reallocation suggestion appears below it.

Crane #04
Sector 3 - Bridge deck
Healthy
Hours this month
342/ 500h
68%
Excavator #11
Sector 1 - Foundations
Healthy
Hours this month
198/ 400h
50%
Generator #02
Sector 4 - Yard power
Service due in 12h
Hours this month
488/ 500h
98%
Suggestion
Schedule service now. Reallocate to Sector 1 after service.
Loader #07
Sector 2 - Aggregate
Healthy
Hours this month
261/ 450h
58%
Compactor #03
Sector 3 - Sub base
Watch - 45h
Hours this month
355/ 400h
89%
Suggestion
Add oil and filter check within 45h to hold healthy status.
Healthy Watch Service dueRefreshed continuously - illustrative sample
Why this exists

Heavy equipment is not a truck on a route. It is hours on a meter.

Every problem below traces back to the same missing piece - a real, unit level record of how many hours each machine has actually run.

Breakdowns mid job

A generator fails on site because nobody tracked its actual running hours - only the calendar date of its last service.

Idle at one site, short at another

A loader sits parked at Sector 3 while Sector 1 rents an extra unit for the week - because visibility ends at the fence.

Service by guess

Maintenance is scheduled by calendar month, not by how hard a machine has actually been run - so it is either too early or already too late.

How Harvinfra works

Four stages, one board.

The stages are not steps a user runs. They are how the engine reasons - continuously, in the background, on every unit.

01
Track

Running hours logged automatically, per unit, across every active site.

02
Predict

Service timing calculated from real usage patterns, not fixed calendar rules.

03
Allocate

Idle equipment is surfaced and reallocated to where work is actually waiting.

04
Comply

Inspection and compliance records stay current, tied to real usage hours.

Numbers that matter

Only three, and only real.

No vanity metrics. These are the three numbers a fleet manager should be able to answer on any given morning.

Real usage
Running hours
per unit, per site, per week
Predicted
Service window
before the next breakdown on site
Reallocated
Idle equipment
to where the work is actually waiting
Build your board

Tell us the shape of your fleet. Watch the board light up.

Pick the equipment you actually run. Set a rough count. The board rebuilds live at your scale, with an illustrative mix of healthy, watch and service due units - and a sample reallocation suggestion.

Equipment types
Rough count
24units
650100150

An illustrative view based on typical patterns - not a live read of your actual fleet. Real data appears once your equipment is connected.

Illustrative board at 24 units
Simulated
Crane #01
Sector 1 - active
Healthy
Hours this month
60/ 500h
12%
Crane #02
Sector 2 - active
Healthy
Hours this month
270/ 500h
54%
Crane #03
Sector 3 - active
Healthy
Hours this month
60/ 500h
12%
Crane #04
Sector 4 - active
Healthy
Hours this month
270/ 500h
54%
Crane #05
Yard - active
Healthy
Hours this month
60/ 500h
12%
Crane #06
Sector 1 - active
Healthy
Hours this month
270/ 500h
54%
Board rebuilds as you change the mixBoard scale 1 : 4